LYON, TRAVAUX AU CANAL DE JONAGE: MACHINE À DAMER
A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.

5.3
(11)
Original Title: Lyon, travaux au canal de Jonage: Machine à damer
Release Date: 19/05/1897
Duration: 1 min.